Crew housing, handled

Housing a crew shouldn't take a spreadsheet and forty phone calls.

bunk takes housing off your desk for the whole year: we find the beds, book every job, and hand you one screen showing who is staying where — and one invoice at the end of the month.

Roster — Pecos Compressor Station 48 / 48 beds
Basin Lodge — Block A
Day crew · 6 mi from site
24 beds
Basin Lodge — Block C
Night crew · blackout rooms
16 beds
Hampton, Monahans
Inspectors · overflow
8 beds
Invoices this month 1
Built for Oil & gas operators / Industrial contractors / Utilities & storm restoration / Data center builds

The old way is a group text and a shoebox of receipts.

Somebody on your team is spending their Tuesday calling motels. Here's what that looks like next to how it should work.

Without bunk
Nine hotels, nine confirmation emails, nine rate sheets
A spreadsheet that was accurate on Monday
Nobody sure who is in room 214 tonight
Thirty invoices to code to one job number
With bunk
One request: how many, where, how long
We source and book the beds at negotiated rates
A live roster anyone on the job can pull up
One invoice, already coded to the project

How it works

Three steps, and two of them are ours.

01

Tell us the job

Headcount, location, dates, shift pattern. We make it easy with a quick, mobile-friendly form to request a new stay.

02

We find and book it

Lodges, man camps, hotels, furnished units — whatever is close, clean, and available. We negotiate, we hold the rooms, we handle the changes.

03

You watch it in one place

Live rosters, room assignments, spend by project, and a single monthly invoice.

What you actually get

A roster that's true right now

Who is staying where, which shift, which room. Updated when we change it, not when someone remembers to.

One invoice per month

Coded to your projects and cost centers, in the format your accounting team already uses.

Rates we already negotiated

We book enough beds in the same places that we don't pay the walk-up rate. Neither do you.

Shift-aware room blocking

Night crew gets the quiet side of the building. Small thing. Not a small thing at 2pm.

Changes without drama

Crew size doubled? Job pushed two weeks? Tell us. Extensions, early checkouts, and swaps are the job, not an exception.

Someone who picks up

A real person on your account, reachable and ready to help.

Every bed on the job, on one line.

Spend by project. Occupancy by night. The number your controller asks for before you've finished looking for it.

Bed-nights, last 6 weeks 4,180
W27W28W29W30W31W32

Tell us about your year. We'll come back with beds and a number.

bunk works on 12-month agreements and up. Usually a same-day reply, always a person, never a portal.

Get a quote